Tanzania steel workshop

The client want to build up a water bottle factory, and it is not a big factory, he need build it by lowest cost, so we consider cost efficient when we design it, try to save money in every technical point view, include civil construction and steel structure design.


  • Project size: 48*20*6m
  • Location: Tanzania, Africa
  • Application: Water bottle factory workshop
  • Project Introduction

    The client want to build up a water bottle factory, and it is not a big factory, he need build it by lowest cost, so we consider cost efficient when we design it, try to save money in every technical point view, include civil construction and steel structure design.

    tan (3)

    tan (4)

    tan (1)

    tan (2)

    Design Parameter

    Building designed wind loading speed :Wind load≥150km/h.
    Building life time: 30 years.
    Steel structure materials: standard Q235 steel.
    Roof&wall sheet: EPS sandwich panel with thickness 50mm.
    Roof&wall purlin(Q235 steel) : big size C steel

    Production & Shipping

    20 days for production.
    52 days for shipping from China to Tanzania.

    Installation

    29 days for civil construction, the client done it by a professional construction company, the construction work is fast with good quality, we recommend our long term cooperated construction company to him.

    Client Feedback

    One stop service, client just tell us his demand and project budget, we did the design work, manufacture work, shipping work, and construction work, quite convenient, he is happy with the one stop service, and told us he will order a new steel structure workshop from us in next month.