page_banner

Cases

Steel structure workshop

The workshop owner got big business in food industry, he made the workshop to produce potato chips, the food industry workshop required clean and smooth steel structure in a high level, we provide him by following every point he required, he is very satisfy with our product quality.


  • Project size: 90*30*6m
  • Location: Djibouti
  • Application: Food process workshop
  • Project Introduction

    The workshop owner got big business in food industry, he made the workshop to produce potato chips, the food industry workshop required clean and smooth steel structure in a high level, we provide him by following every point he required, he is very satisfy with our product quality.

    mmwve (1)

    mmwve (3)

    mmwve (5)

    mmwve (4)

    Design Parameter

    Building designed wind loading speed :Wind load≥250km/h.
    Building life time: 50 years.
    Steel structure materials: standard Q235 steel.
    Roof&wall sheet: EPS panel with thickness 50mm.
    Roof&wall purlin(Q235 steel) :C section Galvanized Steel Purlin
    Door & window: 3 big size door with width 6m, and height 5m.

    Production & Shipping

    5 days to discuss the details design with client.
    20 days to manufacture the all steel structure materials.
    Shipping process takes 47 days since we loaded the goods from our factory in China.

    Installation

    We sent the concrete foundation used bolt before shipping the goods, so he make the concrete foundation finished before our steel structure materials arrived, this way saved his project construction time, so that he can start steel structure assemble once the materials arrived. Totally takes 19 days since materials arrived Djibouti.

    Client Feedback

    The Client is satisfy with our customized design and production service, we follow every his required point as it is used for food industry, every requirement is reasonable.