The client want to build up a factory to produce PVC pipe materials, which is widely used at building, the project located north of Algeria, very hot there told by client, so we have to consider the weather situation when we design it, install a big and strong ventilation system on the workshop.
Building designed wind loading speed :Wind load≥270km/h.
Building life time: 60 years.
Steel structure materials: Steel that follow international standard.
Roof&wall sheet: V970 EPS sandwich panel as roof panel, and V950 EPS sandwich panel as wall cover, which got a good temperature insulation performance.
Roof&wall purlin(Q235 steel) :C section Galvanized Steel Purlin
Door & window: 4 pcs big sliding gate and 2 set line window, every window length is 40 meter, and height is 1m.
25 days for production since the client pay for the deposit, very fast production time.
36 days for shipping from China to Algeria, the shipping fee is very big, so we load every container full to save shipping container for client, only used 2 pcs container shipped all the goods.
Client done the construction work by himself, we just provide the construction drawing to him, and send one engineer to him, it is quite easy work.
The client give a 5 star feedback for our service, he said he never image we send him engineer, because his project is small, and the engineer sending cost is big, but we did it, he thanks for it very much, even small project, but we service him same as big project.