Ethiopia steel workshop

This is a cold rolling mill in Adama city, Ethiopia. The whole project consists of three sets of steel structure workshop, they are 96m*25m*9m and 68m*25m*9m and a two floor office building.


  • Project size: 4800SQM
  • Location: Adama ,Ethiopia
  • Application: Cold rolling factory & Office room
  • Project Introduction

    This is a cold rolling mill in Adama city, Ethiopia. The whole project consists of three sets of steel structure workshop, they are 96m*25m*9m and 68m*25m*9m and a two floor office building. Among them, 96m*25m*9m is equipped with a 10-ton overhead crane.The total area of the project is about 5000 square meters. We provide the owner with all the designs and materials of steel structure part also includes the Solar street lighting system and office interior furniture,Help customers reduce their workload.

    case2 (2)

    case2 (3)

    case2 (4)

    case2 (6)

    Design Parameter

    The below information are the parameters of different parts:
    Workshop building :Wind load≥0.55KN/M2 ,Live load≥0.55KN/M2 ,Dead load≥0.15KN/M2.
    Steel beam &column(Q355 steel):2 layers epoxy antirust oil painting in 160μm thickness color is mid-grey.
    Roof&wall sheet:corrugated galvanized sheet(V-840 and V900) Blue&White&Red
    Roof&wall purlin(Q345 steel) :C section Galvanized Steel Purlin
    Door size is 4*4m sliding door, which can be open and close easily.
    This workshop equipped with 10 Tons overhead crane machine to load inside Steel coil.

    Production & Shipping

    We prepared all steel parts for client during 45days, and packed loaded in 10*40HC containers. Shipping time is 40 days to Djibouti port.Client get containers from Djibouti port and arrange ESL trucks take to his project site.

    Installation

    The owner used local installation team to install the steel structure parts, it cost 60 days totally to finish the foundation and installation work.

    Execute Summary

    From client contact us to project done ,It took a total of 145 day.This is a project with a very fast construction cycle for customers in Ethiopia.Our company are responsible for project design, material processing, and transportation, online support for installation.

    Client Feedback

    The owner are very satisfied with our materials and services, the factory has been successfully put into use, and the his business volume is gradually increasing..